a. Seoktab Industrial Award for development of CNG compressor
CNG compressor is essential equipment for natural gas recharging system. The development of CNG compressor, which needs high-level machinery design technologies and high-pressure related technologies, was selected as a superior material development in September of 2002 and rewarded with Seoktab Industrial Award. With the award, we dream of another leap.
We are going to be born again as a company that continuously extends out for the global stage and makes dedicated efforts for researches.
b. Turbo blower specialized for LNG
The company has successfully finished the LNG Turbo Blower test operation in last May, which has proceeded from 1999 as an industrial technology development project by the Ministry of Commerce, Industry and Energy. The technology development project, which cost 555,020,000Krw for the last 3 years, was planned to replace 100%-imported turbo gas blowers with domestic productions.
LNG ship blowers are compressors that push pressures on BOG (Boil-off gas), which is used as steam turbine fuels in LNG ships or as energy sources that vaporize LNG in the storage factory
c. Kwangshin's new produts and new technologies instlled at Masan, Gapo LNG charging station
For the first time in Korea, our Korean-developed compressor was installed. The charging station that we took the order as a turnkey from designing to construction may charge 120 LNG buses a day.
Errors occurred and information on other situations are delivered to the operator in real time, and a card key system that optimizes the performance under the surveillance system and special conditions was installed with cutting-edge technologies.
|